丰满放荡岳乱蜜桃AV,国产一区二区内射最近更新,久久久久人妻少妇精品色,成人午夜视频在线观看
Contact Us

AC Fan before installation tools ready

Date: 2016-7-18   Click: 1608 Times

"AC Fan" tools preparatory work before installation we can not say more, and other preparatory work by chapter is about the same way, the only difference is directly connected to the wind turbine installation site installation dimensions, as well as reserve installation size requirements is relatively high, the permissible error range is relatively small, foundation dimensions deviation should be within the range of ± 20mm, hollow center of each reserve size deviation should be ± 10mm between, so since we need the fan the size of each extra attention, the error is only installed to a minimum in order to make the fan installation more smoothly.

Back to: Industry news

+86-0769-83660708

Home Product News Contact